1. COVER & SURAT PENGESAHAN print

Others

17 pages
3 views

Please download to get full document.

View again

of 17
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Share
Description
1. COVER & SURAT PENGESAHAN print
Transcript
  TUGAS AKHIRPERANCANGAN ULANG FODASI GEDUNG HOTEL GLOBALBANJARMASIN Diajukan untuk memenuhi persyaratan mencapai derajat Sarjana S1 pada Program Studi Teknik Sipil Fakultas Teknik Universitas Lambung Mangkurat Disusun Oleh:YOSSEF PATTRICKSON PURBAH1A106097 Pembimbing : Ir. Markawie, MTNIP. 19631916 199201 1 001  Co Pembimbing : Arie Febry F, MTNIP. 19790221 200501 1 004 DEPARTEMEN PENDIDIKAN NASIONALUNIVERSITAS LAMBUNG MANGKURATFAKULTAS TEKNIKPROGRAM STUDI TEKNIK SIPILBANJARBARU2010  iii PERANCANGAN ULANG FODASI GEDUNG HOTEL GLOBALBANJARMASIN Oleh:Yossef Pattrickson PurbaH11A106097Pembimbing Utama:Ir. Markawie, MTPembimbing Pendamping:Arie Febry F, MTRINGKASANSemakin berkembangnya era globalisasi, mengakibatkan semakinmeningkatnya mobilisasi penduduk. Untuk mendukung hal tersebut, makadibangunlah gedung hotel Global yang berlokasi di Jl. A. Yani KM. 4,5Banjarmasin, Kalimantan Selatan ini yang diharapkan dapat mengakomodir kebutuhan tersebut. Dalam hal ini perancangan dilakukan dengan menggunakan baja komposit,karena untuk meminimalkan beban yang terjadi pada struktur. Perancangan inimeliputi pada perancangan bangunan atas yaitu perancangan balok, kolom dan pelat, serta bangunan bawah yaitu perancangan fondasi,  pilecap . Perancangan inimengacu pada SNI-03-1729-200 tentang baja dan SNI-03-2847-2002 tentang beton. Dan perhitungan analisa struktur dibantu dengan program ETABS.Dari hasil perhitungan didapatkan dimensi balok baja yang digunakanadalah WF 300x150 6 9;WF 600x200 11 17; WF 250x125 6 9; WF 450x300 1015. Dimensi kolom baja komposi yang digunakan adalah WF 350x350 19 19; WF400x400 18 18; WF 600x200 11 17. Untuk struktur bawah digunaka tiang pancang diameter 40 cm dengan kedalaman rata-rata 40 m. Ada 5 macam tipe  pilecap yang digunakan yaitu: tipe I dengan tiang pacang 2 buah dan ukuran 2 mx 0,8 m dengan beban kerja maksimum sebesar 110 ton, tipe II dengan tiang pacang 3 buah dan ukuran 2,1 m x 1,8 m dengan beban kerja maksimum sebesar 154 ton, tipe III dengan tiang pacang 4 buah dan ukuran 2 m x 2 m dengan bebankerja maksimum sebesar 167 ton, tipe IV dengan tiang pacang 5 buah dan ukuran2 m x 2 m dengan beban kerja maksimum sebesar 249 ton, tipe IV dengan tiang pacang 9 buah dan ukuran 3,2 m x 3,2 m dengan beban kerja maksimum sebesar 391 ton.Kata kunci : perancangan, baja komposit, daya dukung fondasi.  iv REDESIGN FOUNDATION OF GLOBAL HOTEL BANJARMASIN By:Yossef Pattrickson PurbaH11A106097Advisor 1:Ir. Markawie, MTAdvisor 2:Arie Febry Fardheny, MTSUMMARYThe of the growing age of globalization, as a consequence increased mobilization of inhabitan. To support this, has build this building Global Hotelthat located on A. Yani road KM. 4,5 Banjarmasin that expected could be copethat requirement.In this case, the design is done by using composite steel, because in order tominimize the costs incurred in the structure. This design is only limited todesigning buildings for the design of beams, columns and plates, and under the building foundation design, pilecap and settlement. This design refers to the SNI-03-1729-200 on the steel and SNI-03-2847-2002 on the concrete.Assisted structural analysis and computation of the SAP program in 2000.The calculation resulting dimensions of the steel beams used are WF 300.150.6.9;WF 600.200.11.17; WF 250.125.6.9; WF 450.300.10.15. Steel columndimensions used are WF 350.350.19.19; WF 400.400.18.18; WF 600.200.11.17.Under the structure used for pile diameter of 30 and 40 with an average depth of 41 m. There are five types pilecap use, are: type I have 2 pile and dimension 2 m x0,8 m whit maximum load 110 ton, type II have 3 pile and dimension 2,1 m x 1,8m whit maximum load 154 ton, type III have 4 pile and dimension 2 m x 2 m whitmaximum load 167 ton, type IV have 5 pile and dimension 2 m x 2 m whitmaximum load 249 ton, type V have 9 pile and dimension 3,2 m x 3,2 m whitmaximum load 249 ton.Keywords : design, composites steel, foundation bearing capacity.  v PRAKATA Puji syukur penulis panjatkan kehadirat Tuhan Yang Maha Esa, yang telahmemberikan limpahan rahmat dan karunia-Nya, penulis dapat menyelesaikanLaporan Tugas Akhir yang berjudul “Prancangan Gedung Hotel GlobalBanjarmasin dengan Kontruksi Baja Komposit” dengan baik.Pada kesempatan ini penulis mengucapkan banyak terima kasih atas bantuan dan dukungan moril maupun materil dari berbagai pihak, yang penulisterima baik selama perkuliahan sampai saat penulisan skripsi ini. Ucapan terimakasih penulis sampaikan kepada :1.Ayah dan Ibu tercinta serta keluargaku, yang senantiasa memberikan doa,semangat, kasih sayang, pengorbanan, dan segala dukungan yang diberikankepada penulis baik dukungan moril maupun materil.2.Ir. Markawie, MT, selaku pembimbing utama yang telah memberikan nasehat,saran, arahan, bantuan dan bimbingan dalam penyusunan skripsi .3.Arie Febry Fardheny, MT, selaku pembimbing pendamping yang telahmemberikan saran, arahan, dan bantuan dalam penyusunan skripsi.4.Dr-Ing. Yulian Firmana Arifin, MT, selaku dosen penguji atas segala saranyang bersifat membangun.5.Ir. Zainal Abidin Gafar, MT, selaku dosen penguji atas segala saran yang bersifat membangun.6.Ketua Jurusan Program Studi Teknik Sipil Fakultas Teknik UniversitasLambung Mangkurat beserta seluruh staf pengajar (dosen-dosen).  vi7.Cendrawati Pangabdi, S.Si, atas segala bantuan, motivasi, diskusi dankebersamaannya selama 4 tahun ini.8.Teman-temanku; Christ, Bayu, Fernando “dodo”, Edo, Hendra, Roki, Indra,Cahya, Merry yang banyak memberikan bantuan, semangat dan ide selama penulis beruliah di Banjarbaru.9.Semua teman-teman Teknik Sipil angkatan 2006 (Sinoname) atasdukungannya baik secara langsung maupun tidak langsung.10.Semua pihak yang telah membantu penyusunan Tugas Akhir ini yang tidak  bisa disebutkan satu persatu.Penulis menyadari Tugas Akhirini masih jauh dari sempurna, oleh karenaitu penulis mengharapkan kritik dan saran yang bersifat membangun bagikesempurnaan karya dimasa yang akan datang. Semoga Tugas Akhir ini bermanfaat bagi kita semua.Banjarbaru, Januari 2011 Yossef Pattrickson Purba
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks